This means that in some cases, estimates may not be. This option is possible if the construction is in charge of a private organization. All costs are determined by accounting reports on the basis of actual work costs.
This means that in some cases, estimates may not be. This option is possible if the construction is in charge of a private organization. All costs are determined by accounting reports on the basis of actual work costs.
| Валюты | Курс | Изменение % |
|---|---|---|
| 90,53 | +0,01% | |
| 99,37 | +0,50% | |
| 115,18 | +0,59% | |
| 3 829 642,24 | –0,44% | |
| 61,20 | +0,86% | |
| 0,63 | –0,75% | |
| 12,79 | +0,79% | |
| 67,89 | +0,48% |
Курсы валют в RUB на 19.12.2023