If the pool is located in the pool, for them you need to leave the releases of the reinforcement. These parts are poured after the formwork from the sides of the structure is dismantled. Having shot the formwork, you need to check the correspondence of the size of the structure. To align the base, concrete is used, which contains water -repellent additives.















