Site
Around the pool it is necessary to lay out the site (1 — 1.5 meters), which will protect the tank from the fall from the site from the site. After that, the site is concreted and covered with tiles. An important point here is the drainage device next to the site. Do not forget about this when you complete the construction of the pool.














