Swallow screed technology. First, the surface is prepared under the screed, removed, cleaned. Under the screed of the floor, you can use a granlac as a floor insulation. The following, special beacons (sold), or pipes are set in level, are strengthened and after that you can fill the floor screed. In this case, we use the cement screed of the floor, or similar to it. The solution is prepared and gradually poured from the corner. Is pulled out, the solution is aligned with the rule and, as a result, after the completion of the filling and drying it, we get the screed ready for the finish. If the beacons were used during the work, they remain there in the screed, and if the pipes, then they stretch when the screed is grasped, and the grooves after them are carefully smeared, the same solution.