For the construction of the basement in the fundamental base, there are exhalations, after which from 9 to 18 holes are drilled. They are needed to install anchor bolts. After the end of the preparatory process, the surface of the fundamental structure is treated with a waterproofing solution. Hydrostecloisol and film are laid on the base so that humidity does not fall into the area of the basement laid out during further work from brick. Materials for work can be purchased on the Internet. It is also possible to buy other useful items there. Tour tower, for example, will significantly facilitate this work. And it is cheap.