The least time will take the preparation of the mixture for a semi -dry screed. The following materials will be needed: cement, fiber -fiber and sand (the ratio of cement and sand 0.5 kg per 1 cubic meter. m). Then the solution is leveled on the floor on beacons, left to dry for 12 hours and let it stand for about a week. In a week you can start installation of the floor covering.