Ice is diverted from the pipeline highway with deep ditches, which also protect it from the influx of groundwater from the sinking side.
To observe the correctness of the pipeline, audit wells are arranged along it after 100 — 200 m with double lids and thermal insulation between them of sand, peat, grass or straw.















