The second method of installation of the metal floor. First, plywood sheets are glued to the draft floor, and then metal layers are screwed on them. At the same time, the joints between the sheets are covered with a silicone sealant. The main rule during the operation and installation of the metal floor — the contact of electricity with the metal coating should be avoided.