Step 2. Installation of the frame
After the bathroom is prepared, the line of installation of the frame comes. For the installation of plastic panels in the bathroom, a frame made of metal profile, resistant to moisture, is best suited. Buy should buy a cd profile, the same as used for installation of drywall. How the frame is installed? The walls in the bathroom are marked vertically to fix the metal racks. The distance between them should depend on the size of the panels, but not exceed 40 cm. Fixing brackets are attached to vertical markings. Here the gap can be made at 50-60 cm. Then the profile is taken and attached to brackets using small screws.