Thanks to it, it is possible to determine the proper depth of immersion in specific soil, the load on the designed foundation. In case of heterogeneity of the soil, piles are installed at different depths. The entire subsequent process of laying piles takes only a few days. Then they are cut, aligned in height to the desired level and concrete, which is necessary to increase their rigidity.