determination of the emergence of possible hazardous waste and recommendations for organizing their elimination.
Coordination of the project
After drawing up the list of measures of the PMOOS, its coordination is carried out. A positive conclusion should be present in the design documentation. Without it, it is impossible to get a similar positive conclusion of the examination for all design documentation, and, consequently, for work as part of the project.