All auxiliary work on the harvesting of paintings was performed in the workshop. The actual labor costs of the household heat insulation of four devices on the main insulating layer were 224 people.-days to coating insulation with metal — 192 people.-Day and labor of the driver of the AGP-12-12-person car lift.-days, instead of labor costs 1194 people.-day, if the isolation was performed according to the project.