The upper soil layer should be removed on the site and mark the trenches for the drain system. The depth of the trenches should be 0.6 m. Waterproofing is laid on top. To prepare the base under the bottom, you need to fill a layer of gravel with a thickness of 15 cm. On top you need to pour a layer of sand 10 cm.