Then you should build a vertical formwork and pour the walls with concrete. It will take several days to dry the material. It is better to make formwork from iron shields, since less durable material may not withstand the load. After a few days, the formwork should be removed. After that, during the week it is required to moisturize the monolith, since rapid drying is harmful to concrete.