When the concrete is completely dry, you can proceed to the arrangement of the side. To check the bowl, it should be filled with water and follow the level for 5 days. If the level falls, this indicates the presence of leakage. In this case, the water needs to be drained and the cracks in the walls of the bowl. Then the re -check of the bowl is performed.