So that the solution does not flow out of the formwork, it is necessary to seal the structure. The surface of the formwork is required to smear with a special liquid so that the solution does not stick to the material. Then move on to pouring concrete. The mixture begins to be laid out from the lower tier. To avoid the formation of voids, the solution should be tamped. After hardening the steps, the formwork is dismantled.