To perform a pool bowl, reinforced concrete or Europropiles is used. Reinforced concrete structures are considered more durable, but European propylene is lower in cost. Concrete pouring in one stage to exclude the formation of cold seams. First, the bottom is poured. With the help of vibrations, the solution is compiled and void removal. Then the concrete is leveled and left for 2-3 hours so that the material “grabs”. After that, the pool sides are concreted.














