The simplest floor design.
Laying is carried out in a very short period of time (up to 50 square meters per day).
Ideal for heating floors.
Already has lacquer armor previously applied at a factory or plant (in 4 layers).
The simplest floor design.
Laying is carried out in a very short period of time (up to 50 square meters per day).
Ideal for heating floors.
Already has lacquer armor previously applied at a factory or plant (in 4 layers).
Валюты | Курс | Изменение % |
---|---|---|
![]() | 90,53 | +0,01% |
![]() | 99,37 | +0,50% |
![]() | 115,18 | +0,59% |
![]() | 3 829 642,24 | –0,44% |
![]() | 61,20 | +0,86% |
![]() | 0,63 | –0,75% |
![]() | 12,79 | +0,79% |
![]() | 67,89 | +0,48% |
Курсы валют в RUB на 19.12.2023